Mountain Home, Idaho
From rot to remarkable: a bathroom rescue
What looked like a cosmetic update turned into a full restoration when the team found mold, dry rot, and a subfloor that had given up entirely after decades of moisture damage. The flooring around the plumbing was failing and the structure underneath had to be rebuilt from the ground up.
All damaged materials came out. The crew reconstructed the subfloor and joists, installed new flooring, set a modern vanity, and finished a marble-look shower. No shortcuts, no covering problems up.
A modern, safe, watertight bathroom built to handle Idaho's seasonal swings, completed in two days.
- Timeline:
- 2 days
- Hidden damage:
- Rot, mold, failed subfloor
- Result:
- Full structural rebuild







